Abstract:Division points of flood wall at Huangpu River was determined based on the analysis of water level before 1984. Some of the names and locations of the division points are not applicable because of water information changing and rapid urban development. After comprehensive analysis on historical and present situations,division points of flood-control wall at Huangpu River were revised to reduce sections,standardization name,and division point locations unity.
崔冬, 何小燕, 贺英, 陆倩. 上海黄浦江防汛墙墙顶标高分界修订研究[J]. 中国防汛抗旱, 2018, 28(4): 54-59.
Cui Dong, He Xiaoyan, He Ying, Lu Qian. Revision on division points of flood-control wall at Huangpu River,Shanghai. journal1, 2018, 28(4): 54-59.