Emergency investigation and analysis of national dike pre-flood management under epidemic prevention normalization
WANG Jing, LI Na, ZHANG Qingming
1. Yellow River Institute of Hydraulic Research of Yellow River Conservancy Commission, Zhengzhou 450003; 2. Research Center on Levee Safety Disaster Prevention of the Ministry of Water Resources, Zhengzhou 450003
Abstract:In March 2020, the flood prevention work of dike has entered a critical period. In order to prevent COVID-19 from having a significant impact on dike pre-flood management, random telephone checks were carried out. Through this work, the management situation of key epidemic areas, ice storm, snowmelt flood, water damage construction and dike crossing construction during the epidemic prevention and control period were mastered. The investigation found that affected by the epidemic, in some areas, roads are blocked, residents gatherings affect epidemic prevention, workers are stranded outside and cannot return to work, and construction sites destroyed by water and cannot be repaired. This investigation analyzed the causes and put forward countermeasures and suggestions, which effectively promoted the work and reduced the adverse impact of epidemic situation on flood prevention work.
王荆, 李娜, 张清明. 防疫常态化下全国堤防汛前管理工作应急调查分析[J]. 中国防汛抗旱, 2021, 31(5): 63-65.
WANG Jing, LI Na, ZHANG Qingming. Emergency investigation and analysis of national dike pre-flood management under epidemic prevention normalization. journal1, 2021, 31(5): 63-65.