Abstract:The rainfall process from June 15 to 21 and No.4 Xijiang flood and No.2 Beijiang flood occured in the Pearl River basin in 2022 were reviewed from two aspects of precipitation and flood forecasting, some problems found in the analysis, for example the numerical forecast of rainfall was inaccurate, the information of water project was insufficient, and the forecast nodes were not divided in detail were summarized. The relevant suggestions can provide reference for further flood forecasting work in the Pearl River basin in terms of scientific application of rainfall forecast, timely optimization of runoff generation and concentration parameters, orderly refinement of forecast schemes, and timely grape of the operation information of water conservancy projects.
钱燕, 卢康明, 陈学秋, 付宇鹏. 珠江流域“2022.6”暴雨洪水复盘分析[J]. 中国防汛抗旱, 2023, 33(1): 22-26.
QIAN Yan, LU Kangming, CHEN Xueqiu, FU Yupeng. Review on rainstorm flood in the Pearl River basin in June 2022. journal1, 2023, 33(1): 22-26.