Abstract:Hydraulic dam is widely used in the construction of ecological water system in Shanxi Province, but the construction of hydraulic dams has a negative impact on flood dispatch operation.To address the problems, the flood discharge capacity of the hydraulic dam is reviewed; the various schemes of dam collapse are analyzed and compared. Based on the study results, the method of operation gate from downstream to the upstream successively is adopted, which avoid flood superposition and contribute to flood dispatch smoothly. This paper mainly studies the impact of the hydraulic dam on the flood discharge capacity of river course and how to ensure the safety during flood season in the main reach of Fenhe River Basin.
史鹏飞. 汾河流域干流蓄水工程液压坝汛期安全调度[J]. 中国防汛抗旱, 2018, 28(12): 90-92.
SHI Pengfei. Flood safety dispatch of the hydraulic dam during flood seasons in the main reach of Fenhe River Basin. journal1, 2018, 28(12): 90-92.