Numerical simulation of water flow of Dong'an permeable pile dike in Henan Province based on MIKE21
LI Mingyang1,2, ZHANG Baosen1,2, FANG Guohua3, WANG Zili1,2
1. Yellow River Hydraulic Research Institute, Yellow River Conservancy Commission, Zhengzhou 450003; 2. Research Center of Levee Safety and Disaster Prevention, Ministry of Water Resources, Zhengzhou 450003; 3. School of Water Conservancy and Hydropower, Hohai University, Nanjing 210098
Abstract:As a new type of river regulation structure,permeable pile dikes has been applied in the lower reaches of the Yellow River as a non-rescue dikes because of its unique effect of slow flow and sedimentation.The permeability of different permeable pile dikes has been determined during construction.However,in the actual operation process,the permeable pile dikes have been worn and displaces to varying degrees under complex water flow,resulting in a large difference between the pile dikes and the design working condition.Therefore,taking Dong'an Permeable Pile Dike project as the research object,according to the hydrological data of Huayuankou station,a two-dimensional hydrodynamic model of Dong'an project is constructed by using MIKE21 FM software for the simulation from January 1 to April 12,2021,and the measured data on April 12 were used to verify the model.The results show that the maximum error between the simulated section velocity and the measured section velocity is about 8.55%,and the simulation results are satisfactory;MIKE21 FM software has good applicability for river hydrodynamic simulation of Dong'an project.The research results can provide reference for the safe operation of permeable pile dikes.
栗铭阳, 张宝森, 方国华, 汪自力. 基于MIKE21的河南省东安透水桩坝水流数值模拟[J]. 中国防汛抗旱, 2022, 32(10): 67-72.
LI Mingyang, ZHANG Baosen, FANG Guohua, WANG Zili. Numerical simulation of water flow of Dong'an permeable pile dike in Henan Province based on MIKE21. journal1, 2022, 32(10): 67-72.
[1] 钱宁,万兆惠.泥沙动力学[M].北京:科学出版社, 1983. [2] 张宝森.不抢险PHC管桩丁坝研究[J].人民黄河, 2008(10):22-23. [3] 王兴奎,邵学军,李丹勋,等.河流动力学基础[M].北京:中国水利水电出版社, 2002. [4] 胡一三,刘贵芝.黄河治理与水资源开发利用子专题之一:游荡性河段现有整治工程及今后整治原则和措施的研究[R].黄河水利委员会河务局, 1995. [5] 李远发,田治宗,宋莉萱,等.透水桩坝导流落淤效果研究[J].人民黄河, 2008(1):8-9, 12, 79. [6] 姚文艺,王普庆,常温花.护岸式透水桩坝缓流落淤效果及桩部冲刷过程[J].泥沙研究, 2003(2):26-31. [7] 周庆庆.水力插板透水丁坝缓流促淤效果及主要影响因素试验研究[D].乌鲁木齐:新疆农业大学, 2015. [8] 郭江丽.黄河滩区新型混凝土桩坝技术研究[D].大连:大连理工大学, 2018. [9] 锁晓南,李春光,尚彦祥,等.基于MIKE21模型的黄河四排口河段洪水演进数值模拟[J].科技视界, 2021(4):104-107. [10] 王新强.基于MIKE21水动力模型计算感潮河段闸下水位流量关系[J].广东水利水电, 2021(10):42-47. [11] 汪然,王露露,海燕.二维水动力学模型在堤防退建方案比选中的应用[J].工程与建设, 2021, 35(5):918-920. [12] 汪自力,田治宗,何鲜峰,等.堤防深水漏洞抢堵与软体坝围堰堵口技术试验研究[M].郑州:黄河水利出版社, 2021. [13] 马子普,张宝森,邓宇,等.适用于明渠流及冰盖流的统一泥沙颗粒起动流速公式[J].水利学报, 2021, 52(8):969-978. [14] Nakamura K, Kawagucci S, Kitada K, et al.Water column imaging with multibeam echo-sounding in the mid-Okinawa Trough:Implications for distribution of deep-sea hydrothermal vent sites and the cause of acoustic water column anomaly[J].GEOCHEMICAL JOURNAL, 2015, 49(6):579-596. [15] Kim Y, Lippok N, Vakoc B J.Multi-beam OCT imaging based on an integrated, free-space interferometer[J]. Biomedical Optics Express, 2021, 12(1):100.